They handled engineering, delivery and install as one team. We coordinated with one company and the kitchen was serving on the date they promised.
MM
KCI provided a 2,500 sq. ft. five-wide temporary kitchen for CMH, maintaining full food-service operations throughout a 24-month renovation
Bolivar, Missouri
1,500 meals per day
2,500 sq. ft.
24 Months


KCI built a 1,352 sq. ft. semi-permanent kitchen for Whittier Elementary, designed for reuse on future school renovation projects.
Washington D.C.
900 Meals per day
1,300 Sq. Ft.
Semi- Permanent


A multi-phase temporary kitchen kept resident dining running at a senior living community through a full production and warewashing renovation.
North carolina
1,200 meals/day
680 sq ft



Temporary kitchens of every scale – from a single trailer to 2,250+ sqft engineered, delivered, and installed nationwide by our experienced team.
They handled engineering, delivery and install as one team. We coordinated with one company and the kitchen was serving on the date they promised.
MM
An 18-month renovation, zero interruption to patient and cafeteria food service. Kitchen Corps made a hard project feel routine.
AP
When our galley went down we needed feeding capability fast. A compliant unit was on-site and operational inside the window they committed to.
MC
Or call us, 24/7
(757) 487-8977
KCI provided a 2,500 sq. ft. five-wide temporary kitchen for CMH, maintaining full food-service operations throughout a 24-month renovation
Bolivar, Missouri
1,500 meals per day
2,500 sq. ft.
{acf_project_build_time}


KCI built a 1,352 sq. ft. semi-permanent kitchen for Whittier Elementary, designed for reuse on future school renovation projects.
Washington D.C.
900 Meals per day
1,300 Sq. Ft.
{acf_project_build_time}


A multi-phase temporary kitchen kept resident dining running at a senior living community through a full production and warewashing renovation.
North carolina
1,200 meals/day
680 sq ft
{acf_project_build_time}

