
Single Production Kitchen
8.5′×53′
450 sqft
2,000 Meals/Day
Full commercial cooking, prep, warewashing, and cold storage in one compact 8.5' × 53' temporary kitchen facility.
View this model →Keep student breakfast and lunch service running while your school kitchen is renovated, expanded, or replaced.
Plan Your Temporary Kitchen
K-12 Temporary Kitchen
Fully Equipment for Daily Meal Service
Support your food-service team with a temporary kitchen planned around student meal counts, menus, and daily serving schedules.
Give your food-service team a dedicated space to prepare breakfast and lunch while work proceeds on the permanent kitchen.
Plan cooking equipment, preparation areas, cold storage, and warewashing around your school's menus and production needs.
Configure your temproary kitchen around meal volume, available campus space, delivery access, and staff workflow.
KCI handles delivery and installation and assists your project team in coordinating site access and utility connections.

Washington, D.C.
1,350 sq. ft. 3-wide Facility
Contractor: MCN Build

Hudson Falls Central, NY
1,800 sq. ft. 3-wide Facility + Freezer/Prep

8.5′×53′
450 sqft
2,000 Meals/Day
Full commercial cooking, prep, warewashing, and cold storage in one compact 8.5' × 53' temporary kitchen facility.
View this model →
25.5'×53'
1,352 sqft
4,000 Meals/Day
Our most popular multi-unit configuration, combining cooking, prep, refrigeration, warewashing, and storage for full commercial kitchen replacement.
View this model →
8.5'×53'
450 sqft
5000 Dishes/hour
Dedicated warewashing, three-compartment sinks and prep space to pair with any cookline.
View this model →Identify available space, equipment delivery routes, staff access, and utility connection requirements.
Plan equipment and work areas around breakfast and lunch counts, menu requirements, and serving periods.
Plan installation, equipment testing, and staff preparation around school breaks and your construction schedule.
Tell us about your project. We’ll help you plan a temporary kitchen around your operation, your site and your timeline.