MCN Build – Whittier Elementary School

  • Location

    Washington D.C.

  • Output

    900 Meals per day

  • Temporary Facility Size

    1,300 Sq. Ft.

  • Project Length

    Semi- Permanent

Project Overview

As part of the major modernization of Whittier Elementary School in Washington, DC, MCN Build needed a complete commercial kitchen to support food service operations at the school’s temporary swing-space campus.

Rather than providing a traditional rental facility, KCI Temporary Kitchens, LLC designed and built an all-new, semi-permanent three-unit kitchen facility that MCN Build purchased for the project.

The investment provides a solution for Whittier today while giving MCN the ability to relocate and reuse the kitchen for future school renovation projects.

What operators ask first

Yes. KCI can provide temporary and semi-permanent commercial kitchen facilities configured around a school’s food service requirements, available space, project duration and equipment needs.

Multiple interconnected units provide considerably more usable space and allow KCI to create dedicated operational zones.  At Whittier, the three units form a single commercial kitchen facility with separate production, preparation, and warewashing areas.

MCN Build purchased the facility from KCI rather than renting it.  This allows the kitchen facility to be relocated and used to support future school renovation projects.

A temporary or semi-permanent kitchen allows a school to maintain food service operations while its permanent kitchen or campus is under construction, helping minimize disruption to students and staff.

Past projects

MCN Build – Whittier Elementary School

KCI built a 1,352 sq. ft. semi-permanent kitchen for Whittier Elementary, designed for reuse on future school renovation projects.

  • Washington D.C.

  • 900 Meals per day

  • 1,300 Sq. Ft.

  • Semi- Permanent

Three-unit semi-permanent KCI commercial kitchen facility installed for Whittier Elementary School’s temporary swing campus in Washington, DC.
Production of three-unit semi-permanent KCI commercial kitchen facility installed for Whittier Elementary School’s temporary swing campus in Washington, DC.
View Project

Citizens memorial Hospital Temporary Kitchen

KCI Provided a 2,500 SqFt 5-wide temporary kitchen for CMH, maintaining full food-service operations throughout a 24-month renovation

  • Bolivar, MO

  • 1,500 Meals Per Day

  • 2,500 SqFt

  • 24 Months

KCI Temporary Kitchens five-wide temporary kitchen facility being installed at Citizens Memorial Hospital in Bolivar, Missouri.
Interior of KCI’s 2,500 sq. ft. five-wide temporary hospital kitchen featuring commercial cooking, prep, warewashing, and stainless-steel work areas.
View Project

Palmetto Lowcountry Behavioral Health

KCI provided a 1,350 sq. ft. three-wide temporary kitchen to maintain food service during renovations at Palmetto Lowcountry Behavioral Health.

  • North Charleston, SC

  • 350-400 Meals Per Day

  • 1,350 Sq. Ft.

  • 12+ Months / Ongoing

View Project

Planning a Kitchen Renovation?

Keep food service running without interruption. KCI designs and deploys temporary commercial kitchen facilities tailored to your operation, site, and project timeline.

  • Location

  • Production

  • Dimensions

  • Timeline

Coming Soon Kitchen Facilities
Coming Soon Kitchen
Discuss Your Project

Tell us about your project.
Keep operations running

  • Nearly 30 Years of Experience
  • Code-Compliant Facility
  • Nationwide Deployment

TALK WITH OUR TEAM

(757) 487-8977

This field is for validation purposes and should be left unchanged.
Name(Required)
Please let us know what's on your mind. Have a question for us? Ask away.
All Models