Challenge
A multi-year school modernization required a reliable commercial kitchen solution capable of supporting daily meal production while the permanent school underwent extensive renovations. The temporary campus needed the functionality of a permanent institutional kitchen without sacrificing flexibility for future use.
✓ Maintain Daily Food Service: Provide the cooking, preparation, and warewashing capabilities necessary to support students and staff at the temporary campus.
✓ Deliver a Complete Kitchen Facility: Incorporate commercial cooking equipment, food preparation areas, refrigeration, freezer storage, warewashing, and dry storage.
✓ Support Long-Term Operations: Design a durable, semi-permanent facility suitable for extended use throughout the school’s modernization.
✓ Plan for Future Relocation: Create a modular kitchen solution that MCN Build could relocate and reuse on future school construction projects.













