
Single Production Kitchen
8.5′×53′
450 sq ft
2,000 Meals/Day
Full commercial cooking, prep, warewashing, and cold storage in one compact 8.5' × 53' temporary kitchen facility.
Flexible configurations built to support institutional foodservice during renoations, construction, emergencies, and other operational disruptions.

From compact single-trailer kitchens to full-scale multi-unit facilities, KCI offers temporary kitchen configurations designed around production capacity, workflow, available space, and project requirements.

8.5′×53′
450 sq ft
2,000 Meals/Day
Full commercial cooking, prep, warewashing, and cold storage in one compact 8.5' × 53' temporary kitchen facility.

25.5'×53'
1,352 sq ft
4,000 Meals/Day
Our most popular multi-unit configuration, combining cooking, prep, refrigeration, warewashing, and storage for full commercial kitchen replacement.

42.5'×53'
2,253 sq ft
5,000 Meals/Day
Our largest temporary kitchen configuration, providing expanded cooking, prep, warewashing, refrigeration, freezer, and storage capacity for high-volume operations.

8.5'×53'
450 sq ft
Ideal when paired with a production kitchen
Dedicated walk-in freezer with food preparation space to pair with any cookline.

8.5'×53'
450 sq ft
5000 Dishes/hour
Dedicated warewashing, three-compartment sinks and prep space to pair with any cookline.

Custom to Project
Scalable/Custom sq ft
Designed to Meal Volume
Custom temporary kitchen facilities designed around your operation, meal volume, equipment requirements, available space, and project conditions.
Support meal service for patients, staff, and visitors.
Keep resident meal preparation aligned with daily dining routines.
Support daily meal production for personnel, staff, and trainees.
Keep campus dining running during kitchen renovations.
Support student breakfast and lunch during kitchen improvements.
Support high-volume meal production around facility schedules.
They handled engineering, delivery and install as one team. We coordinated with one company and the kitchen was serving on the date they promised.
MM
An 18-month renovation, zero interruption to patient and cafeteria food service. Kitchen Corps made a hard project feel routine.
AP
When our galley went down we needed feeding capability fast. A compliant unit was on-site and operational inside the window they committed to.
MC
Tell us about your project. We’ll help you plan a temporary kitchen around your operation, your site and your timeline.