They handled engineering, delivery and install as one team. We coordinated with one company and the kitchen was serving on the date they promised.
MM
KCI built a 1,352 sq. ft. semi-permanent kitchen for Whittier Elementary, designed for reuse on future school renovation projects.
Washington D.C.
900 Meals per day
1,300 Sq. Ft.
Semi- Permanent


KCI Provided a 2,500 SqFt 5-wide temporary kitchen for CMH, maintaining full food-service operations throughout a 24-month renovation
Bolivar, MO
1,500 Meals Per Day
2,500 SqFt
24 Months


KCI provided a 1,350 sq. ft. three-wide temporary kitchen to maintain food service during renovations at Palmetto Lowcountry Behavioral Health.
North Charleston, SC
350-400 Meals Per Day
1,350 Sq. Ft.
12+ Months / Ongoing



Temporary kitchens of every scale – from a single trailer to 2,250+ sqft engineered, delivered, and installed nationwide by our experienced team.
They handled engineering, delivery and install as one team. We coordinated with one company and the kitchen was serving on the date they promised.
MM
An 18-month renovation, zero interruption to patient and cafeteria food service. Kitchen Corps made a hard project feel routine.
AP
When our galley went down we needed feeding capability fast. A compliant unit was on-site and operational inside the window they committed to.
MC
TALK WITH OUR TEAM
(757) 487-8977
KCI built a 1,352 sq. ft. semi-permanent kitchen for Whittier Elementary, designed for reuse on future school renovation projects.
Washington D.C.
900 Meals per day
1,300 Sq. Ft.
Semi- Permanent


KCI Provided a 2,500 SqFt 5-wide temporary kitchen for CMH, maintaining full food-service operations throughout a 24-month renovation
Bolivar, MO
1,500 Meals Per Day
2,500 SqFt
24 Months


KCI provided a 1,350 sq. ft. three-wide temporary kitchen to maintain food service during renovations at Palmetto Lowcountry Behavioral Health.
North Charleston, SC
350-400 Meals Per Day
1,350 Sq. Ft.
12+ Months / Ongoing