Past projects

MCN Build – Whittier Elementary School

KCI built a 1,352 sq. ft. semi-permanent kitchen for Whittier Elementary, designed for reuse on future school renovation projects.

  • Washington D.C.

  • 900 Meals per day

  • 1,300 Sq. Ft.

  • Semi- Permanent

Three-unit semi-permanent KCI commercial kitchen facility installed for Whittier Elementary School’s temporary swing campus in Washington, DC.
Production of three-unit semi-permanent KCI commercial kitchen facility installed for Whittier Elementary School’s temporary swing campus in Washington, DC.
View Project

Citizens memorial Hospital Temporary Kitchen

KCI Provided a 2,500 SqFt 5-wide temporary kitchen for CMH, maintaining full food-service operations throughout a 24-month renovation

  • Bolivar, MO

  • 1,500 Meals Per Day

  • 2,500 SqFt

  • 24 Months

KCI Temporary Kitchens five-wide temporary kitchen facility being installed at Citizens Memorial Hospital in Bolivar, Missouri.
Interior of KCI’s 2,500 sq. ft. five-wide temporary hospital kitchen featuring commercial cooking, prep, warewashing, and stainless-steel work areas.
View Project

Palmetto Lowcountry Behavioral Health

KCI provided a 1,350 sq. ft. three-wide temporary kitchen to maintain food service during renovations at Palmetto Lowcountry Behavioral Health.

  • North Charleston, SC

  • 350-400 Meals Per Day

  • 1,350 Sq. Ft.

  • 12+ Months / Ongoing

View Project

Your project could be next.

When your kitchen can't go dark, you need more than a trailer. Kitchen Corps engineers, builds and installs a full commercial kitchen on your site, running the day you need it.

  • Location

  • Production

  • Dimensions

  • Timeline

Coming Soon Kitchen Facilities
Coming Soon Kitchen
Start the conversation
temporary kitchen specialist kitchen corps

When your permanent kitchen goes down, you can keep serving

Temporary kitchens of every scale – from a single trailer to 2,250+ sqft engineered, delivered, and installed nationwide by our experienced team.

Don’t just take our word for it

They handled engineering, delivery and install as one team. We coordinated with one company and the kitchen was serving on the date they promised.

MM

Matthew Moss
Regional Director, ARAMARK

An 18-month renovation, zero interruption to patient and cafeteria food service. Kitchen Corps made a hard project feel routine.

AP

Allen Pemberton
Dir. Food & Nutrition, UTMB Galveston

When our galley went down we needed feeding capability fast. A compliant unit was on-site and operational inside the window they committed to.

MC

M.T. Crites
United States Marine Corps

Tell us about your project.
Keep operations running

  • Nearly 30 Years of Experience
  • Code-Compliant Facility
  • Nationwide Deployment

TALK WITH OUR TEAM

(757) 487-8977

This field is for validation purposes and should be left unchanged.
Name(Required)
Please let us know what's on your mind. Have a question for us? Ask away.

Past projects

MCN Build – Whittier Elementary School

KCI built a 1,352 sq. ft. semi-permanent kitchen for Whittier Elementary, designed for reuse on future school renovation projects.

  • Washington D.C.

  • 900 Meals per day

  • 1,300 Sq. Ft.

  • Semi- Permanent

Three-unit semi-permanent KCI commercial kitchen facility installed for Whittier Elementary School’s temporary swing campus in Washington, DC.
Production of three-unit semi-permanent KCI commercial kitchen facility installed for Whittier Elementary School’s temporary swing campus in Washington, DC.
View Project

Citizens memorial Hospital Temporary Kitchen

KCI Provided a 2,500 SqFt 5-wide temporary kitchen for CMH, maintaining full food-service operations throughout a 24-month renovation

  • Bolivar, MO

  • 1,500 Meals Per Day

  • 2,500 SqFt

  • 24 Months

KCI Temporary Kitchens five-wide temporary kitchen facility being installed at Citizens Memorial Hospital in Bolivar, Missouri.
Interior of KCI’s 2,500 sq. ft. five-wide temporary hospital kitchen featuring commercial cooking, prep, warewashing, and stainless-steel work areas.
View Project

Palmetto Lowcountry Behavioral Health

KCI provided a 1,350 sq. ft. three-wide temporary kitchen to maintain food service during renovations at Palmetto Lowcountry Behavioral Health.

  • North Charleston, SC

  • 350-400 Meals Per Day

  • 1,350 Sq. Ft.

  • 12+ Months / Ongoing

View Project

Planning a Kitchen Renovation?

Keep food service running without interruption. KCI designs and deploys temporary commercial kitchen facilities tailored to your operation, site, and project timeline.

  • Location

  • Production

  • Dimensions

  • Timeline

Coming Soon Kitchen Facilities
Coming Soon Kitchen
Discuss Your Project
All Models