When the temporary facility arrives on site KCI will have a crew on site to receive the unit(s). Then the unit will be blocked and leveled into place where the unit will remain for the duration of the project.
As the client is connecting the necessary utilities to the temporary facility, KCI representatives will be installing any necessary exhaust and make up fans and removing any shipping material and straps.
Once utilities are connected, KCI representative will turn on the facility and all equipment and complete a final testing. The representative will then complete a walk-through with the client to verify the operations as well as complete any necessary training.
This amount of time to complete a set-up varies by the size of the temporary facility and the availability of utilities.