What are the power requirements for a temporary facility?

What are the power requirements for a temporary facility?

KCI provides many different types and size facilities. Each specific facility can require slightly different power requirements.
Typically, a single production kitchen unit will be equipped with a 120/208v 3ph 200Amp Main Breaker Panel.
Typically, a single dish washing unit will be equipped with a 120/208v 3ph 600Amp Main Breaker Panel.
Typically, a single preparation unit will be equipped with a 120/240v 1Ph 200Amp Main Breaker Panel.
Any multi-unit facilities will depend on the configuration of units and the power requirements will be specific to that facility.

Category: Products